Home / Portfolio / Valley New Build

New home · Active project · Framing complete

Valley New Build

Active project · Framing complete Inside the new home in framing: open stud walls and window openings with afternoon light

The original house came down to the foundation, and a new 2,014 sf home is being framed in its place.

Type
New home
Size
2,014 sf
Scope
New construction from the foundation, fire sprinklers
Status
Active project, framing complete

Before

  1. Living room of the original house before teardown, with a brick fireplace

    The original house

  2. Corner of the original living room with its brick fireplace and wood floors

    Before teardown

The work

  1. New wall framing going up on the subfloor

    01Walls going up

  2. Long framed corridor with ceiling joists overhead

    02Framing

  3. The framed great room, with window and door openings

    03Great room framed

  4. The framed living room around the fireplace, sheathing on and windows cut in

    04Framed living room

The reveal

Finishes to come.

About the project

The original house came down to the foundation. In its place we are building a new 2,014 sf home, with a residential fire sprinkler system (NFPA 13D).

The framing is complete and the shell is sheathed. Finishes are next.

Planning a project like this one?

We'll walk the property with you, talk through goals and budget, and follow up with a written, line-by-line proposal.