What can go wrong, and how we handle it

Every construction project runs into something. The difference is whether you hear about it up front, with a plan, or find out halfway through. These are the issues we see most, explained honestly.

What if you find a problem behind the walls?

What it is
Conditions nobody can see until demolition: water damage, termite damage, outdated or unsafe wiring, undersized framing, or earlier work that wasn't done to code.
How often it comes up
Often, especially in older Los Angeles homes and in projects that open up many walls or floors. It's one of the most common reasons a budget changes after work starts.
How we handle it
Our proposal names the conditions we can't see and how they'll be handled. If we find something, we stop that part of the work, show you photos, explain the options and price the fix in a written change order before going further.

Why do permits and plan check take longer than expected?

What it is
Plans are reviewed by the city before work can start, and reviewers often return corrections that need revised drawings or engineering. Review times depend on the agency and its workload, not on the contractor.
How often it comes up
Correction rounds are a normal part of permitting for additions, new homes and structural remodels. Smaller, non-structural work tends to move faster.
How we handle it
We coordinate the drawings, engineering and Title 24 work with our design partners, respond to corrections promptly and keep you updated on where your plans stand. Permit and agency fees are listed separately in your proposal so they never come as a surprise.

Will there be change orders?

What it is
A change order is a written amendment to the contract that adds, removes or changes work, along with its price and schedule effect.
How often it comes up
On most projects of any size. Some come from hidden conditions; many come from homeowners deciding they want something different once they see the space take shape.
How we handle it
Every change is written, priced and approved by you before the work happens. No verbal changes, no surprise invoices at the end. How change orders are priced

What happens when materials are delayed?

What it is
Windows, doors, custom cabinetry, specialty tile and some appliances are made or shipped to order. When they arrive late, the trades that depend on them wait too.
How often it comes up
Regularly, particularly with custom and imported items. Lead times vary by product and supplier and can change after an order is placed.
How we handle it
We build a selections schedule early and ask for long-lead choices first, so orders go in before they're needed. If a delay happens anyway, we resequence work where we can and tell you what it means for the schedule.

Can we live in the house during construction?

What it is
Living at home during a remodel means dust, noise, trades on site during working hours and, at times, no kitchen or a shared bathroom.
How often it comes up
It's one of the first questions we're asked. For smaller or phased scopes it's often workable; for whole-home remodels with major systems or structural work, moving out is usually more practical.
How we handle it
We talk it through at the consultation, plan the phasing around how you'll live, and protect and seal off occupied areas. If staying isn't realistic for your scope, we'll tell you plainly.

How do we keep upgrades from blowing the budget?

What it is
Budget creep is the gradual climb from many small upgrades: a nicer faucet here, extra lighting there. Each feels minor; together they add up.
How often it comes up
On nearly every remodel to some degree. It's not a problem in itself, as long as you can see the running total.
How we handle it
Allowances set a clear budget for each selection, every upgrade is priced in writing before it's ordered, and your project manager can show you the current contract total at any point.

Ask us about your risks

At the consultation we'll walk the property with you and point out what's most likely to come up on your project, before you commit to anything.