What does it cost to rebuild a home in Pacific Palisades after the fire? (2026 guide)

A plain-English budget guide for Palisades homeowners: what goes into the number, what moves it, and which rules and programs change it in 2026.

By David Gaon · Reviewed by a licensed contractor, 1 Degree Construction, CSLB License #1075129 (B, General Building Contractor)
Updated · 10 min read

The short answer

Plan the budget in four parts: construction of the house, soft costs (design, engineering, reports and plan check), site work on the cleared lot, and items the code now requires. For a new home or rebuild with mid-to-upper finishes, our planning range is roughly $400 to $700 per square foot of living space, including finish allowances and design and permit work, before government fees and site work. Hillside foundations, basements and very high-end finishes push it higher. Rebuilds that stay within 110% of the original home qualify for the City's permit-fee waiver, which helps, but it does not change construction cost.

The January 2025 fire left many Palisades families facing a question nobody plans for: what will it actually cost to build the house again? The honest answer is that it depends on a handful of decisions you control, a few site conditions you don't, and a set of rules that have changed several times since early 2025. This guide walks through each part so you can build a budget you trust before you sign anything.

We're a design-build general contractor based in Studio City, currently building a single-story rebuild on a cleared Palisades lot. The ranges below come from our own recent pricing on Westside new homes. They are past-project ranges, not quotes. Every regulatory statement links to its official source at the end of the article.

How should I think about the total budget?

Break the number into four buckets. Most budget surprises come from treating the first bucket as the whole thing.

BucketWhat's in itWhat drives it
ConstructionFoundation, framing, roof, windows, exterior, systems, interior finishes, general conditionsSize, shape, finish level, structural complexity
Soft costsDesign, structural engineering, survey, soils report, energy calculations, plan checkHow custom the design is; how much engineering the site needs
Site workUtility connections, sewer, grading, retaining walls, driveway, hardscape, landscape, poolThe lot itself and what you choose to rebuild outside the house
Code and program itemsWildfire construction requirements, fire sprinklers, energy-code choices, any fees not waivedThe permit path you choose and your insurance coverage

Table: The four parts of a rebuild budget

A per-square-foot number almost always means the first bucket only. When you compare figures from builders, adjusters or neighbors, ask which buckets are inside it.

What does construction cost per square foot?

For a new home or rebuild with mid-to-upper finishes, our planning range is roughly $400 to $700 per square foot of living space. That range comes from projects we've built and invoiced recently, and it is deliberately wide. It covers building the house (foundation through finishes, supervision and general conditions), the finish allowances, and design and permit work handled through our design-build process. It does not include government and agency fees, site work outside the house footprint, or anything you select above the allowances.

What moves a house within that range, or past it:

  • Finish level. Cabinetry, stone, tile, plumbing fixtures, lighting and flooring are where two houses of the same size diverge most. A clear allowance schedule is how you control this (see how allowances work).
  • Shape and structure. A simple single-story rectangle is the most efficient way to enclose space. Second stories, cantilevers, large openings that need steel, and complex roof lines all add cost.
  • Glazing. Wide sliding or folding door systems and floor-to-ceiling windows cost more, and in a fire hazard zone they must also meet the glazing rules described below.
  • The site under the house. Hillside lots, caisson or grade-beam foundations and soils that need over-excavation add cost before anything goes vertical.
  • Size. Kitchens, baths and mechanical systems cost about the same whether the house is large or small, so smaller homes usually cost more per square foot even when they cost less in total.

Hillside lots, homes with basements and very high finish levels can go well beyond that range. If someone gives you one number without asking about these things, treat it as a rough guide, not a budget.

An illustration, not a quote

A 3,000 sf home at $500 per square foot is $1.5 million. Add site work, agency fees and any upgrades above allowances, and the all-in figure is higher. Run the same math at both ends of the range before you compare it with your policy limits.

What are the soft costs?

Soft costs are everything you pay for that isn't labor and materials on site. For a rebuild they typically include:

  • Architectural or design-build design fees and construction drawings
  • Structural engineering, and civil engineering if the lot needs grading or drainage design
  • A boundary and topographic survey
  • A soils (geotechnical) report. LADBS publishes specific guidance on soil and geology reports for Palisades rebuilds on its wildfire information page
  • Title 24 energy calculations
  • Plan-check and permit fees, unless waived (next section)

In a design-build contract, much of this sits inside one proposal; with an independent architect, design fees are a separate contract. Either way, the spread depends mostly on how custom the design is and how much engineering the site needs. Ask every bidder to list soft costs separately so you can compare like with like.

Are permit fees really waived?

For many owners, mostly yes. In April 2025 the Mayor suspended collection of plan-check and permit fees for Palisades rebuilds under Emergency Executive Order No. 7. A City ordinance that took effect on July 16, 2026 then waived LADBS permit and clearance fees for repairs and rebuilds up to 110% of the original structure's floor area. Three conditions matter for your budget:

  1. It applies to owners who held the property on January 7, 2025.
  2. Fees on area above 110% are still charged.
  3. If the property is sold before a certificate of occupancy is issued, the seller must repay the waived fees (condominiums and townhomes excepted).

The waiver covers City fees. It does not lower construction cost, and it may not cover every outside agency charge. Confirm what applies to your address with LADBS before you count on it.

Like-for-like or larger: how does the choice change the cost?

The City's Emergency Executive Order No. 1 created a streamlined path for rebuilding in substantially the same location, up to 110% of the footprint and height of what stood before the fire. That path skips several discretionary reviews, and non-conforming setbacks from the old house can generally remain. The new house still has to meet the current building code.

You can build larger. The portion beyond the old footprint must meet current zoning: setbacks, height and floor-area limits. Lots in the Coastal Zone have a separate zoning-compliant option under Executive Order No. 8. Going larger affects the budget three ways:

  • Construction: more square feet, at roughly the same rate per foot.
  • Fees: area above 110% is not waived.
  • Property tax: the LA County Assessor has stated it will treat a rebuild of up to 110% of the original square footage as substantially equivalent, which preserves the prior base-year value. Added area beyond that can be assessed. Ask the Assessor how it applies to your plans.

What site costs come with a cleared lot?

A cleared lot is not a blank slate. Budget for these before you finalize the house:

  • Utilities. New electrical, water and gas service, and any undergrounding LADWP requires. LADBS links LADWP's guidance on its rebuild page.
  • Sewer lateral. Have the line from the house to the street inspected by camera. Repair or replacement is a site cost that is easy to miss.
  • Grading, drainage and retaining walls. Especially on sloped lots. Retaining walls that didn't exist before are generally new work, not part of a like-for-like rebuild.
  • Hardscape and landscape. Driveways, walks, walls, irrigation and planting. In fire hazard zones, the area right around the house is subject to defensible-space rules, which shapes what you plant there.
  • Pools, spas and outbuildings. Priced separately, and not always covered by the same permit path as the house.

Which code items are now required, and what do they add?

Two requirements apply to almost every Palisades rebuild regardless of permit path.

Wildfire construction rules. Much of the Palisades is in a Very High Fire Hazard Severity Zone. New homes there follow California's wildland-urban interface construction standards, which were consolidated into the new California Wildland-Urban Interface Code (Title 24, Part 7) effective January 1, 2026. The State Fire Marshal summarizes them. In practice that means a Class A roof assembly, ember-resistant vents, ignition-resistant exterior walls, multi-pane glazing with at least one tempered pane (or a fire-rated alternative), and protected eaves, decks and underfloor areas. Most items are modest on their own; together they are a real line in the budget, so ask to see them called out.

Fire sprinklers. California requires automatic fire sprinklers in new one- and two-family dwellings. A rebuilt house is a new dwelling, so plan for a sprinkler system and, depending on your water service, a larger meter or a backflow device.

Energy code: you may have a choice. Under Executive Order N-37-25, homes substantially damaged or destroyed in the January 2025 fires can follow the 2022 California building code instead of the 2025 code, except for fire and public-safety standards, and solar-ready rules still apply. An earlier order suspended the requirement to install rooftop solar and batteries. If your policy includes Ordinance or Law (code upgrade) coverage, N-37-25 lets you build to the current energy standards and treat the added cost as a code-upgrade expense. Using the 2022 option trades lower upfront cost against long-term operating cost; we price both when a client asks.

How does insurance timing affect the budget?

You don't need to settle your claim before you start design, but you do need to know your deadlines. For losses from a declared state of emergency, Insurance Code section 2051.5 gives you no less than 36 months from the first actual-cash-value payment to collect full replacement cost, subject to your limits, with extensions for good cause. It also allows replacement cost to be used to rebuild or buy elsewhere. The Department of Insurance summary covers the related rules on living expenses and contents.

Two practical points from our side of the table:

  • An adjuster's estimate and a contractor's proposal are built differently. Ours lists scope, allowances and exclusions line by line, which makes it easier to see where a gap comes from.
  • Code-required items, like the wildfire construction details and sprinklers above, are the ones most worth checking against your Ordinance or Law coverage.

We can explain what's in our numbers, but we don't give legal or insurance advice; for coverage questions, the Department of Insurance and a qualified advisor are the right sources.

How do I get a number I can trust?

  1. Start with the lot. Get the survey and soils report early. They settle the biggest unknowns under the house.
  2. Pick the permit path deliberately. Like-for-like, larger, or Coastal Zone. Each one changes fees, review time and property tax.
  3. Set finish levels before drawings are final. Allowances that match what you actually want are the single best defense against budget creep.
  4. Ask for all four buckets in writing. Construction, soft costs, site work and code items, each listed separately.
  5. Use the official resources. The City's One-Stop Rebuilding Center and the LA County rebuilding hub can answer address-specific permit questions.

For a first range on your own lot, configure it in the pricing guide.

If you already have a budget or a proposal and want a second set of eyes on it, we're glad to look. You can also see the rebuild we're building now on our Pacific Palisades project page.

Sources

Rules and programs change. We link to the official source for every regulatory statement in this article; check it for the current version before you rely on it.

  1. LADBS: 2025 Los Angeles Wildfires information (rebuild guidance, One-Stop Rebuilding Center, plan submittal)
  2. Office of Mayor Karen Bass: Emergency Executive Order suspending collection of rebuilding fees (EO 7)
  3. Palisades News: permit fees waived for Palisades rebuilds (ordinance effective July 16, 2026)
  4. Governor of California: Executive Order N-37-25 (November 24, 2025)
  5. California Office of the State Fire Marshal: Building in the Wildland
  6. California Building Standards Commission: current codes (2025 Title 24, effective January 1, 2026)
  7. California Insurance Code section 2051.5
  8. California Department of Insurance: important laws for property policies after a declared disaster
  9. LA County Board of Supervisors: post-disaster property assessment standards after the 2025 wildfires (110% substantially-equivalent interpretation)
  10. LA County Recovers: rebuilding resources

Questions we get asked

Are permit fees waived for Palisades fire rebuilds?

For many owners, yes. A City of Los Angeles ordinance that took effect in July 2026 waives LADBS permit and clearance fees for rebuilds or repairs up to 110% of the original structure's floor area, for people who owned the property on January 7, 2025. Fees for area above 110% are still due, and if the property is sold before a certificate of occupancy is issued, the seller repays the waived fees. Confirm your eligibility with LADBS before you budget around it.

Can I rebuild bigger than my old house?

Yes. Mayor's Emergency Executive Order No. 1 offers a streamlined like-for-like path up to 110% of the original footprint and height. You can go larger, but the added portion has to meet current zoning (setbacks, height and floor-area limits), and you may lose some of the fee and property-tax benefits tied to the 110% threshold. Coastal Zone lots have their own option under Executive Order No. 8.

Do I have to install solar on a Palisades rebuild?

Not necessarily. Governor's Executive Order N-29-25 suspended the rooftop solar and battery requirement for homes substantially damaged or destroyed in the January 2025 fires, and N-37-25 (November 2025) lets those projects follow the 2022 building code instead of the 2025 code, except for fire and public-safety standards. Solar-ready requirements still apply.

How long do I have to collect replacement cost from my insurer?

For losses tied to a declared state of emergency, California Insurance Code section 2051.5 gives you no less than 36 months from the first actual-cash-value payment to collect full replacement cost, subject to your policy limits, with extensions for good cause. This is general information, not legal advice; your policy controls the details.

Is it cheaper to rebuild the same house?

Usually somewhat, because the permit path is faster and the fee waiver and property-tax treatment are tied to the 110% threshold. But the new house still has to meet the current building code, including wildfire construction rules and fire sprinklers, so a like-for-like rebuild is not a copy of a 1960s house at 1960s cost.

Want a number for your lot and your plans?

Book a consultation. We walk the property, review what you have so far, and follow up with a written, line-by-line proposal so you can compare it with anything else on the table.